隨著我國(guó)的經(jīng)濟(jì)迅速的發(fā)展,在工農(nóng)業(yè)的生產(chǎn)中,重慶升降機(jī)的使用實(shí)在是太廣泛了,已經(jīng)普及到人們的社會(huì)生產(chǎn)的方方面面。但是對(duì)于重慶升降機(jī)的操作規(guī)程需要了解一下。With the rapid development of economy in our country, the use of the elevator in Chongqing is too wide, and has spread to all aspects of people's social production. But for the Chongqing elevator operation procedures need to know.
1.使用重慶升降機(jī)必須配置經(jīng)過(guò)專門培訓(xùn),考試合格,持證上崗的專業(yè)操作人員。Chongqing elevator must be configured with specialized training, examination qualified, professional operation personnel certification.
2.重慶升降機(jī)操作人員必須按照機(jī)械設(shè)備的保養(yǎng)規(guī)定,在執(zhí)行各項(xiàng)檢查和保養(yǎng)后方可啟動(dòng)升降平臺(tái),工作前應(yīng)檢查升降機(jī)的工作范圍,清除妨礙升降機(jī)回轉(zhuǎn)及行走的障礙物。Chongqing elevator operation of mechanical equipment maintenance personnel must be in accordance with the provisions in the implementation of the inspection and maintenance before starting the lifting platform, check the elevator work scope should be clear before work, obstacle walking and rotary lift.
3.經(jīng)常檢查所有的電線、電纜有無(wú)損傷,要及時(shí)的包扎和更換已損傷的部分。Often check all the wires, cables, there is no damage, to the timely dressing and replacement of damaged parts.
4.重慶升降機(jī)支持升降平臺(tái)操作的重要準(zhǔn)備工作,要選擇一個(gè)合適的平坦的表面,如果地基松軟或者不均勻,需要做相應(yīng)的處理后才能工作。Chongqing lift to support the operation of the lifting platform is an important preparatory work, to choose a suitable flat surface, if the foundation is soft or uneven, you need to do the appropriate treatment to work.
5.重慶升降機(jī)一般應(yīng)先起下臂,再起中臂,最后起上臂。在升降機(jī)旋轉(zhuǎn)的操作過(guò)程中,一定要在其下臂起升高度前旋轉(zhuǎn),緩緩的轉(zhuǎn)動(dòng),而剪切臂和一個(gè)平臺(tái),各種設(shè)備的距離是否滿足安全的需求。Chongqing elevator general should play under the arm in arm, back, arm end. In the operation of the elevator rotation, must be in its lower arm lifting height before rotation, slowly rotating, while the shear arm and a platform, a variety of equipment to meet the needs of the safety of the distance.
6.在重慶升降機(jī)工作的時(shí)候要帶好安全帶,帶電的工作領(lǐng)域應(yīng)該要按照規(guī)定的地面升降平臺(tái),升降的操作應(yīng)該是由負(fù)責(zé)人指揮的。When Chongqing lifts work should wear safety belt, electric field of work should be in accordance with the provisions of the ground lifting platform, the lifting operation should be directed by the person in charge.
7.重慶升降機(jī)的動(dòng)力系統(tǒng)不啟動(dòng),這也是人們?cè)谌粘9ぷ魃a(chǎn)中最容易忽略的問(wèn)題,這樣的情況一般都是最明顯的開(kāi)光沒(méi)有啟動(dòng)。Dynamic system of Chongqing elevator does not start, this is the most easily overlooked in the daily work of the production problem in this situation is generally the most obvious light did not start.
8.重慶升降機(jī)的螺絲太松了或者太緊了,這個(gè)小問(wèn)題一般都不會(huì)被發(fā)現(xiàn),可是這個(gè)問(wèn)題存在著極大的安全隱患,在日常使用升降機(jī)的過(guò)程中,一定要注意這個(gè)問(wèn)題,注意安全。Chongqing lifts the screws are loose or tight, this small problem generally will not be found, but this problem has great security risks, in the process of daily use lifts, must pay attention to this problem, Caution.
9.重慶升降機(jī)作業(yè)前,工作負(fù)責(zé)人應(yīng)向操作人員,進(jìn)行技術(shù)和安全交待,內(nèi)容應(yīng)包括:工作內(nèi)容及要求;安全注意事項(xiàng)及危險(xiǎn)點(diǎn);人員分工情況及責(zé)任范圍。Chongqing lifts before operation, the responsible person should be accountable to the operators, technology and safety, the content should include: the contents and requirements of the work; safety precautions and dangerous point; division of labor and responsibility.
工作負(fù)責(zé)人除要對(duì)車況和操作人員進(jìn)行檢查以外,還要負(fù)責(zé)查看地形環(huán)境、起降是否符合安全技術(shù)措施的要求或事先制定的工作方案,如有出入,則應(yīng)制定出相應(yīng)的措施后方能開(kāi)始工作。The responsible person in addition to check on the condition and operating personnel, will be responsible for the work plan view the terrain environment, landing in compliance with safety technical measures required or pre established, if different, should formulate corresponding measures before start work.
全國(guó)服務(wù)熱線
187-2321-1948聯(lián)系電話
微信掃一掃